The principal contractor must not later than five days after the work has been completed provide the owner with sufficient information for the following:
Regulation 39 Information about ventilation
Regulation 40 Information about fuel and power
Regulation 40B Information about overheating
This should be provided via a document called a Home Energy Guide. The following link provides a useful editable template that can be used for this purpose.