The principal contractor must not later than five days after the work has been completed provide the owner with sufficient information for the following:

Regulation 39 Information about ventilation
Regulation 40 Information about fuel and power
Regulation 40B Information about overheating

This should be provided via a document called a Home Energy Guide. The following link provides a useful editable template that can be used for this purpose.

https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/1039934/Home_Energy_User_Guide.odt